सामान पैक करने का कार्य का विवरण
1. At first, the unit is thoroughly cleaned and Wrapped with Polythene Sheet.
2. Then the entire instrument is covered by Thermocol or Mic-Pag wherever it is necessary.
3. Foundation is also made on the wooden platform to hold the equipment in its original position.
4. At last, the wooden box is sealed to pack the complete instruments .